Drainage system and entertainment areas

The garden area here was extremely wet and needed some drainage as well as all the clay soil removing from the site.

Click on photographs for closer view.

Drainage as well as all the clay soil removing from the site.

 

Drainage as well as all the clay soil removing from the site.

The area was firstly stripped of the turf and sub-soil, before the task of adding the land drains. These were laid out in a herring-bone design to catch all surface water.

The area was firstly stripped of the turf and sub-soli, before the task of adding the land drains. These were laid out in a herring-bone design to catch all surface water.

 

The area was firstly stripped of the turf and sub-soli, before the task of adding the land drains. These were laid out in a herring-bone design to catch all surface water.

The drainage was wrapped in membrane to stop the soil contaminating the gravel and pipe work. Railway sleepers were used to retain the plant beds to the rear and sides of the garden.

The drainage was wrapped in membrane to stop the soil contaminating the gravel and pipe work. Railway sleepers were used to retain the plant beds to the rear and sides of the garden.

 

The decking frames being constructed.

The decking frames being constructed.

As well as the pergola posts & cross – beams

As well as the pergola posts & cross –beams

Pergola erected and top deck under construction. The pergola followed the route of the pathway to the top deck area.

Pergola erected and top deck under construction. The pergola followed the route of the pathway to the top deck area.

Hardwood decking laid to main areas; all boards are piloted first before screws fixings – this stops splitting.

Hardwood decking laid to main areas; all boards are piloted first before screws add – this stops splitting.

Stepping stones connect across the levelled lawn and turf being laid.

Stepping stones connect across the levelled lawn and turf being laid.

 

Stepping stones connect across the levelled lawn and turf being laid.

 

Stepping stones connect across the levelled lawn and turf being laid.

The lawn has taken and trees planted to rear of garden – lights added to deck area and pathway under the pergola.

The lawn has taken and trees planted to rear of garden – lights added to deck area and pathway under the pergola.

 

The lawn has taken and trees planted to rear of garden – lights added to deck area and pathway under the pergola.